Customization: | Available |
---|---|
Certification: | CE, ISO |
Control System: | Hasco |
Still deciding? Get samples of US$ 5580/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment methods: | |
---|---|
Support payment in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Veries No. | Technical Item | Technical Parameters |
1 | Machine Name | Two Component Sealant Extruder |
2 | Mixing Rate | 6:1-14:1 |
3 | Base Material Volume | 200L |
4 | Curing Agent Volume | 20L |
5 | Max. Squeezing Pressure | 30MPA |
6 | Dimension | 1100*950*1980mm |
a. It adopts the most advanced international technologies, which is applicable to sealing and bonding of insulating glass and curtain wall glass as well as machinery manufacturing.
b.Component A pump and Component B pump are driven by high quality imported pneumatic systems respectively.
With the contact-free electrical control system, a reliable and sensitive switching of direction is realized.
c. The key functional parts are made of high tension and quality stainless steel with thermal treatment, the reliability and durability
of the machine are greatly improved, ensuring a fairly well quality of machine.
d. The curing agent system is fully closed, which prevents the agent from contacting air and therefore solidification occurs.
The fluid flow rate stability is ensured and mixing effect improved.
e.The material pump, curing agent pump and proportional pump high pressure valve of the machine are made of special leakage-free alloy by grinding. The proportional pump is installed with an adjustable proportioning mechanism; the nearly fastidious proportioning requirements of the B component adhesive are fulfilled, as well as those of curtain wall glass and insulating glass.
Company and Products Advantage:
Delivery time is guaranteed
5000m3 glass equipment processing workshop.
60-100 double glazing machines are inspected and accepted every month.
Reasonable production management process to ensure the machine quality.
110 Professional and technical workers.
Every front-line production worker has undergone strict pre-job training.
One worker only completes one process of product production to ensure the production of high-quality products. Each process is inspected to ensure the accumulative accuracy of the product.
Supports ODM and OEM.
12 technical R&D persons.
We provide different solutions for different industries, so as to meet the technical requirements of different industries as much as possible.
Perfect after-sales service system.
35 after-sales service personnel with more than ten years working experience.
2-3 engineers are responsible for one area to ensure the professional and timely debugging work, so that users can put into production as soon as possible. Every year we hold a quality journey, visit new and old users everywhere, help them to check the machine and listen to the actual needs of customers, so as to do a good job of market research for our product technology upgrade.
Complete pre-sale service network.
86 pre-sales engineers are distributed in all corners of the world, providing different solutions for users in all walks of life.
CCILASR all machines come with 3 years warranty, and we have the certifications of ISO9001, BV, CE, ect.
A. Question: What kind of our company is CCI GROUP?
Re: CCI GROUP is window glass machines expert since year 1991 and laser machines expert since year 2002.
B. Question: How is double glazing machine guarantee?
Re: b1.double glazing machine warrenty period is 18 months after BL time;
b2.12 hours technical support feedback;
b3. Own machining factory, which can control the spare parts quality at high quality;
b4. Own accessories warehouse and user can enjoy the agent price.
C.Question: How is delivery time?
Re: We can delivery the machines within 7 days if we have the machines in stock.
The common machine fabricating time is 15-25 days and CNC machine fabricating time is about 25-50 days.If you have customized products, the delivery time will be given after confirmation.
D. Question: How is payment?
Re: 50% of amount as deposit and the balance should be paid by T/T or LC at sight before seller delivery the machines to loading port.
E.Question: How is our package?
Re: Wooden Pallet/ Wooden Case. In order to ensure high quality products precision, the perfect package is necessary.
F. Question: Why is price higher than other supplier?
Re: f1. We have our own machining factory and the high quality technical quality is our aim;
f2. All the electric parts and pneumatic parts are high quality. Most of them are imported from european and american market;
f3. Most of fabricating worker has more than 10 years working time. Their fabricating work is professional and salary is higher;
f4. Our warrenty period is 24 months after BL time. It can support the new comer client going well in the beginning time.