Customization: | Available |
---|---|
After-sales Service: | Online and User Factory |
Warranty: | 10 Months After Bl Time |
Still deciding? Get samples of US$ 1680/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1 | Laser Power | 220V 50Hz 60W/ 80W/100W/ 130W/ 150W/180W |
2 | Working Environment | Temperature: 0-45ºC, Humidity5-95%(No Condensate Water) |
3 | Processing Scope | 1300*900mm |
4 | Laser Type | RECI/YONGLI/ EFR CO2 laser Tube |
5 | Laser Tube Cooling Type | Pure circulating water |
6 | Power Supply | AC110V/220V±10%, 50HZ/60HZ |
7 | energy regulation | 0-100% adjusting by inner software |
8 | Controlling Software | Ruida control system |
9 | Drive System | High Precision Stepper Motor |
10 | Engraving Speed | 0-60000mm/min |
11 | Cutting Speed | 0-30000mm/min |
12 | Location Precision | ≤±0.01mm |
13 | Highest Scanning Precision | 2500DPI |
14 | Min. word | 1.0*1.0mm (English Letter); 1.5*1.5mm (Chinese characters) |
15 | Available graphics software | It can distinguish *.plt, *.dst, *.dxf, *.bmp, *.dwg, *.ai, *.las and support Photoshop, Tajima, AutoCAD, Core Draw Software |
16 | Auxiliary Equipment | Exhaust Fan and Air Exhaust Pipe |
Company and Products Advantage:
Delivery time is guaranteed
15000m3 laser equipment processing workshop.
300-500 laser marking machines are inspected and accepted every month.
Reasonable production management process to ensure the machine quality.
110 Professional and technical workers.
Every front-line production worker has undergone strict pre-job training.
One worker only completes one process of product production to ensure the production of high-quality products. Each process is inspected to ensure the accumulative accuracy of the product.
Supports ODM and OEM.
12 technical R&D persons.
We provide different solutions for different industries, so as to meet the technical requirements of different industries as much as possible.
Perfect after-sales service system.
35 after-sales service personnel with more than ten years working experience.
2-3 engineers are responsible for one area to ensure the professional and timely debugging work, so that users can put into production as soon as possible. Every year we hold a quality journey, visit new and old users everywhere, help them to check the machine and listen to the actual needs of customers, so as to do a good job of market research for our product technology upgrade.
Complete pre-sale service network.
86 pre-sales engineers are distributed in all corners of the world, providing different solutions for users in all walks of life.
A. Question: What kind of our company is CCILASER?
Re: CCI is laser cutting machines, laser welding machines, laser marking machines manufacturing expert since year 2002.
B. Question: How is co2 laser cutting machine guarantee?
Re: b1.co2 laser cutting machine warrenty period is 12 months after BL time;
b2.12 hours technical support feedback;
b3. Own machining factory, which can control the spare parts quality at high quality;
b4. Own accessories warehouse and user can enjoy the agent price.
C.Question: How is delivery time?
Re: We can delivery the machines within 7 days if we have the machines in stock.
The common machine fabricating time is 15-25 days and CNC machine fabricating time is about 25-50 days.If you have customized products, the delivery time will be given after confirmation.
D. Question: How is payment?
Re: 50% of amount as deposit and the balance should be paid by T/T or LC at sight before seller delivery the machines to loading port.
E.Question: How is our package?
Re: Wooden Pallet/ Wooden Case. In order to ensure high quality products precision, the perfect package is necessary.
F. Question: Why is price higher than other supplier?
Re: f1. We have our own machining factory and the high quality technical quality is our aim;
f2. All the electric parts and pneumatic parts are high quality. Most of them are imported from european and american market;
f3. Most of fabricating worker has more than 10 years working time. Their fabricating work is professional and salary is higher;
f4. Our warrenty period is 12 months after BL time. It can support the new comer client going well in the beginning time.